U.S. clean energy grows, but new power lines don’t

Executive Editor

Cipher is proud to make our journalism free for all to read and republish. Unless otherwise noted, you may republish our articles for free as long as you abide by our Creative Commons license and the following terms: 

  • Credit Cipher and any co-reporting partners. In the byline, we prefer “Author Name, Publication(s).” At the top of the text of your story, include a line that reads: “This story was originally published by Cipher.” You must link the word “Cipher” to the original URL of the story.
  • If you’re republishing online, you must link to the URL of this story on ciphernews.com, include all of the links from our story and use our PixelPing tag.
  • If you use canonical metadata, please use the Cipher URL. For more information about canonical metadata, refer to this Google SEO link.
  • You can’t edit our material, except to reflect relative changes in time, location and editorial style. (For example, “yesterday” can be changed to “last week,” and “Portland, Ore.” to “Portland” or “here.”
  • For questions or help, please email [email protected] with the subject line: “Republishing.”
<header><h1>U.S. clean energy grows, but new power lines don’t</h1><a href="" rel="author"></a><span class="title"></span><time rel="pubdate" datetime="2022-06-22T00:00:00-04:00">Jun 22, 2022</time></header><div id="attachment_773" style="width: 1602px" class="wp-caption alignnone"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-773" class="wp-image-773 size-full" src="https://ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter.jpeg" alt="" width="1592" height="1063" srcset="https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter.jpeg 1592w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-300x200.jpeg 300w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-1024x684.jpeg 1024w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-768x513.jpeg 768w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-1536x1026.jpeg 1536w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-1120x748.jpeg 1120w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-775x517.jpeg 775w, https://www.ciphernews.com/wp-content/uploads/2022/06/062222_PowerLines_Newsletter-545x364.jpeg 545w" sizes="(max-width: 1592px) 100vw, 1592px" /><p id="caption-attachment-773" class="wp-caption-text">Source: Grid Strategies LLC, Federal Energy Regulatory Commission • Data includes power lines with 345 kilovolts or more of electricity potential, which are considered major transmission lines.</p></div><p>The number of renewable energy projects seeking approval to connect to electricity grids has increased significantly in recent years, yet the number of miles of new power lines constructed over a similar timeline has gone down.</p><p>Less than 20% of wind and solar projects that sought regulatory approval to connect to electricity grids reached operation between 2000 and 2016, according to the same <a href="https://emp.lbl.gov/sites/default/files/queued_up_2021_04-13-2022.pdf?utm_source=hs_email&amp;utm_medium=email&amp;_hsenc=p2ANqtz-_IFMTE7W_sizYjR9AGm4ugyEpgoHwfGdJWPbdU0wmjVBWp1FRfDIPUsejq22XhtKgKDX1j" target="_blank" rel="noopener" data-ac-default-color="1" data-hs-link-id="2">LBNL study</a> mentioned above.</p><p>The time projects spend waiting for that approval has also increased from about two years in the first decade of this century to nearly four years in the last decade.</p><p>The average miles of power lines built annually between 2010 and 2015 was more than 1,700, compared to less than 650 miles between 2016 and 2020, according to federal data analyzed by consulting firm Grid Strategies.</p><p>Several factors feed into this, including local opposition and what most experts say is a misappropriation of cost allocations.</p><p>New projects often must pay for certain grid updates in their entirety, a cost created by, and a benefit enjoyed by, many projects.</p><p>The hurdles pile on top of each other.</p><p>The interconnection queue backlogs of wind and solar projects worsen because there aren’t enough power lines to go around.</p><p>“That’s a deterrent,” said Caroline Golin, Google’s global head of energy market development and policy. “We want to deploy all this private capital and green the grid, but it’s hurry up and wait.”</p>
U.S. clean energy grows, but new power lines don’t

by -
June 22, 2022
Source: Grid Strategies LLC, Federal Energy Regulatory Commission • Data includes power lines with 345 kilovolts or more of electricity potential, which are considered major transmission lines. The number of renewable energy projects seeking approval to connect to electricity grids has increased significantly in recent years, yet the number of miles of new power lines constructed over a similar timeline has gone down. Less than 20% of wind and solar projects that sought regulatory approval to connect to electricity grids reached operation between 2000 and 2016, according to the same LBNL study mentioned above. The time projects spend waiting for that approval has also increased from about two years in the first decade of this century to nearly four years in the last decade. The average miles of power lines built annually between 2010 and 2015 was more than 1,700, compared to less than 650 miles between 2016 and 2020, according to federal data analyzed by consulting firm Grid Strategies. Several factors feed into this, including local opposition and what most experts say is a misappropriation of cost allocations. New projects often must pay for certain grid updates in their entirety, a cost created by, and a benefit enjoyed by, many projects. The hurdles pile on top of each other. The interconnection queue backlogs of wind and solar projects worsen because there aren’t enough power lines to go around. “That’s a deterrent,” said Caroline Golin, Google’s global head of energy market development and policy. “We want to deploy all this private capital and green the grid, but it’s hurry up and wait.”